An electric utility shall make Internet energy metering available to eligible client-generators on a primary-arrive, very first-served foundation till the sooner of either: (i) June thirty, 2029; or (ii) the primary date upon which the cumulative building ability of net metering devices equals four p.c from the utility's peak demand https://exchangepower.com.au/